Cape Cod Rail Trail, Lecount Hollow Road-Nickerson State Park
»
Slumping fill
(image 35 of 62)
Pavement is breaking apart on the southern ramp to the Route 6 bridge due to slumping of the fill below it, as of June 12, 2004 -- less than two years after completion of construction. This was repaired during the 2005-2006 reconstruction.
Generated by
JAlbum 7.4
/
PositionMap 5.7.3
Photos and captions by
John S. Allen
unless otherwise indicated.