First slide Previous slide    Index Page    Next slide Last slide

No EXIF Info   
Pavement is breaking apart on the southern ramp to the Route 6 bridge due to slumping of the fill below it, as of June 12, 2004 -- less than two years after completion of construction. This was repaired during the 2005-2006 reconstruction.
Generated by JAlbum 7.4 / PositionMap 5.7.3
Photos and captions by John S. Allen
unless otherwise indicated.